Esterra Park Block 3

Leed Gold Certification

6 Week Excavation

Month Schedule

Designed with Technology in Mind

Block 3, on the northeast corner of Esterra Park, features 246,500 square feet of office space across seven floors. Floor plans are designed with technology tenants in mind, offering large floors, open office spaces, flexible infrastructure, and high power density to support productive workgroups. Esterra Park features mountain views and building systems optimized to reduce operating expenses. Floor-to-ceiling glass fills office spaces with natural light, while warm and well-appointed common areas provide a comfortable place to work and collaborate. Three levels of below-grade parking include a new access road and bike storage.

Project Specifications

Address:  15550 Northeast Turing Street, Redmond, WA

Client:  Capstone Partners

Architect:  ZGF Architects

Structural Engineer:  Coughlin Porter Lundeen

Size:  246,500 SF

Populous Hotel

As the final phase of the Esterra Park development, Block 3 is a carbon-neutral project. The structure is concrete with post-tensioned slabs, and the JTM team eliminated garage core walls through shear columns and a steel penthouse. The building envelope consists of a south elevation curtain wall, ribbon windows, and slate wall tile with prefabricated exterior framing panels. JTM's self-performed work included site concrete walls.

Press + Awards

2022: AGC 2022 Build Washington Award Finalist | Over $100M Category

LEED Gold

Project Team

Derek Deeter

Derek Deeter

Aaron O'Kelly

Aaron O'Kelly

Martin Sanchez

Martin Sanchez

Justin Egge

Justin Egge

Savek Butorac

Savek Butorac

Martin O'Leary

Martin O'Leary

Jim Pritchett

Jim Pritchett