Esterra Park
Block 3

Designed with Technology in Mind

Block 3, on the northeast corner of Esterra Park, features 246,500 square feet of office space on seven floors. Floor plans are designed with technology tenants in mind: large floors, open office spaces, flexible infrastructure, and lots of power enabled for high density and productive workgroups. With its stunning mountain views, Esterra Park is designed to foster innovation and productivity while providing all the elements of a balanced lifestyle. Building systems are optimized to reduce operating expenses. The floor-to-ceiling glass fills office spaces with natural light, while the common areas are warm and nicely appointed making them a pleasant place to work, collaborate, and innovate. Three levels of below-grade parking include a new access road and bike storage.

  • Address: 15550 Northeast Turing Street, Redmond, WA, USA
  • Status: Completed
  • Client: Capstone Partners
  • Architect: ZGF Architects
  • Structural Engineer: Coughlin Porter Lundeen
  • Size: 246,500 SF Office Space

Carbon Neutral Construction is the wave of the future. The final phase of the Esterra Park Development is a carbon-neutral development.

Block 3 is a concrete structure with post-tensioned slabs. The JTM team eliminated garage core walls via shear-columns and a steel penthouse.

The building envelope consists of south elevation curtain wall, ribbon windows, and slate wall tile with prefabricated exterior framing panels.

JTM’s self-performed work included site concrete walls.